Secrets of Bonding # 128: The Unexpected Cause of Contractor Failure

Why do construction companies go out of business? What reasons have you heard for companies shutting down?

  • “The economy is terrible.”
  • “There’s no work.”
  • “Too many bidders. You can’t get a decent profit and I won’t work for nothing.”

All these explanations amount to the same thing: A lack of projects resulting in low revenues, low profits and no cash flow. The situation seems obvious. When there isn’t enough work available, many contractors are forced to shut down. So is this THE BIG cause of contractor failure? Surprisingly,  no!

closed1Many construction companies fail because they have too much work. Is it possible that too much of a good thing spells disaster? We’ve all heard the stories about lottery winners who say the money ruined their lives. Suddenly they’re rich, but they weren’t ready for it. The very thing they wanted more of, turned out to be their undoing.

For construction companies, the mission is to acquire and perform profitable contracts. A tremendous amount of effort is spent in the pursuit of new work. So what can go wrong to make the volume a disadvantage, causing the demise of the enterprise?

Capital

One answer is the Lack of Sufficient Capital – both the money kind and people. As companies grow, more liquid resources (cash) are needed to finance the start of new projects and solve problems. Human resources are needed such as field supervision and back office support. Companies can fail when the office staff is unable to keep pace with the paperwork. Billings don’t go out on time, receivables are not collected, cash flow is choked off.  It is management’s responsibility to anticipate these needs and prevent the deficiencies.

Field production can suffer when the supervisory staff is inadequate. This leads to reduced gross and net profits, less available cash, the beginning of a downward spiral.

Managmentclosed2

Consider the Corner Office: Poor leadership, lack of business knowledge and inadequate financial management can be catastrophic. In addition to setting the tone and establishing the company mission, the bosses must have the technical knowledge a larger company requires.  They must be sophisticated financial managers to control resources and garner needed support from financial institutions. The successful manager of a mid-sized business is not necessarily equipped to run a large company.

New Geographic Territory

Management’s pursuit of growth can lead the company into new geographic markets (the grass is always greener.)  This may present unexpected challenges and obstacles including local union resistance, unfamiliar underground conditions, logistics problems, reduced labor productivity rates, adverse weather conditions, etc.  On the east coast (I’m a New Yorker), bond underwriters have long shared stories of NY contractors who ventured to Florida and got their butts kicked…  They say “Florida beaches are littered with the bones of NY contractors.”

Adding New Type Work

Some companies have strayed from their normal type of work in the pursuit of added revenues. They get in trouble trying to enter and compete as newcomers to the field. The company may lack the expertise (estimating, field management) for the new type work. How can you be successful in a competitive bidding environment when going against companies already entrenched in the market?  Do you take work cheap and hope for the best? “We’re losing money but we’ll make it up on volume.”

Our point of view is based on surety bond underwriting. All these issues are well known to bonding companies. When their construction clients want dramatic growth, new types of contracts or transition to a new geographic market, that’s a red flag. They come back with the hard question, “Tell us: Why this is a good idea?”closed3

Contractors may feel that sureties hold them back. Maybe they are too conservative. Do they really want contractors to grow? They think they know better than the contractor?

Actually, the surety and the contractor succeed or fail together. Having seen good clients encounter unexpected problems, underwriters know firsthand how quickly things can unravel.

Writing more bonds and bigger bonds is how bonding companies grow. Certainly, construction companies must grow to survive, and being bigger can be better.  But uncontrolled growth is the major cause of contractor failure that sureties, and contractors, must avoid.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Not available in all states including Idaho.

Secrets of Bonding #126: Surety Bonds in the Bizarro World

There have been 24 movies about Superman, but I loved the original TV series starring George Reeves (the real Superman). Even before that, there were Superman comic books published by DC Comics.

BizarroThe character, “Bizarro #1,” first appeared in 1958 – a mirror image of Superman but from a world where everything was opposite from that of humans. That was over 50 years ago, but strangely, there is a little piece of Bizarro World that still survives today. It is alive in our surety rate system. See if you agree…

Example #1

A contractor won a $1 million contract. The specification calls for a 50% performance bond: $500,000. The surety’s maximum exposure is $500,000.

Bizarro Fact: The bond rate is based on the contract amount, the full $1 million!

Example #2

Sureties often issue a Performance and Payment Bond in a single combined instrument that states the bond amount once (the penal sum). However, if required, they will issue two separate instruments, one Performance and the other Payment, each with it’s own penal sum (double the amount in the combined bond form.)

Bizarro Fact: When required to issue this double bond amount, the bond premium remains the same as for the combined bond form!

Example #3

The contractor has already started the project. Now it has been verified that 50% of the work is completed and accepted by the project owner. It is confirmed that all related bills have been paid. It is apparent that 50% of the exposure has been eliminated.

Bizarro Fact: The bond costs the same as if it had been issued at the start of the work. There is no reduction or recognition for the portion of the exposure that has been eliminated.

Example #4

The contractor has negotiated a $1 million contract. Now the project owner has indicated that a P&P bond must be provided. The surety states that the cost of the bond will be 2% of the contract amount. Is the cost 2% of $1 million ($20,000)?

Bizarro Fact: No! The correct calculation is 2% of $1,020,000 or $20,400. The bond premium is calculated on itself, even though it cannot be classified as part of the contract exposure.

There you have it: The upside-down world we actually live in. Naturally there are justifications for all the procedures sureties use, but still, they are Bizarro!

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #124: Underwriting Challenge – What’s Wrong With This Picture?

Years ago when I was just a cub reporter for the Daily Planet, I mean surety underwriter, I ran into a strange situation that was recently repeated.  In this article we will present the scenario and ask you to use your underwriting judgement. The question is… “What’s wrong with this picture?”

Scenario #1

Originally this came up on a Lost Instrument Bond.  These are needed when requesting the issuance of a duplicate cashier’s check, security, or other financial instruments.  The applicant claimed a negotiable instrument (anyone holding it could potentially cash it in) had been inadvertently destroyed. He was a young adult in his 20’s who had inherited the asset.  His financial statement showed little other than the asset in question, which was a problem because the underwriters do not want to feel that the person has a reason to fraudulently convert the “lost” asset and it’s replacement.

We wrote back and expressed the underwriting concern, that the applicants financial position was inadequate.  In response we received a novel proposal: When the replacement instrument is issued, it will be conveyed directly to the surety who can hold it as full collateral against their exposure, until the bond is released (years!) “There will be no risk to the surety.”  Sounds pretty good? 

In my infantile underwriting mind I thought this sounded intriguing, but it also made me uncomfortable. Why had I never heard of doing this before? Maybe I was on the verge of creating an entirely new underwriting procedure.  Will they name it after me?

What was wrong with this picture?

Scenario #2Whats_wrong

In the more recent situation, the surety was being asked to support a multi-million dollar purchase transaction.  The applicant (a person) was a foreigner, an accomplished business person, who was not familiar with surety underwriting requirements.  They were not accustomed to providing personal financial info or involving the spouse in business obligations.

As a way of supporting the transaction, and maybe dodging the indemnity requirements, it was suggested that title to the purchased property would be conveyed directly to the surety (sound familiar?).  After the financial transaction (which was the subject of the surety guarantee) is completed, the surety will be released, the title will be transferred to the buyer, and “the surety will never be in a position of risk.” Boom!  Let’s do it!

What’s wrong with this picture?

The Answer

Here is good advice.  If your underwriting brain feels like something is wrong, it probably is!  The problem with both these scenarios is the timing.  

Bonding companies ALWAYS secure their position before assuming an obligation. It is incumbent on the underwriters to protect their company assets and its owners by doing so. 

Think about bank lending practices, which are not unlike surety underwriting.  Would a bank make a building loan relying solely on the future value of the project? No, they require being secured with sufficient assets in advance such as the company and personal net worth of the applicant and possibly other collateral.

Financial obligations always require that the credit grantor be secured in advance. Prudent decision making requires this.

So the next time you see something that doesn’t feel right, trust your gut.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #123: Who Was Edward Aloysius Murphy, Jr. (& Why Contractors Should Care)

(January 11, 1918 – July 17, 1990) An American aerospace engineer who worked on safety-critical systems for the U.S. Air Force. He is best known for his namesake Murphy’s Law, which  states, “Anything that can go wrong will go wrong.”  Murphy regarded the law as crystallizing a key principle of defensive design, in which one should always assume worst-case scenarios.Murphys_Law

Keeping Major Murphy’s principle in mind, what are the critical steps contractors can take to get their projects off on the right foot, and bring them to a successful conclusion – while keeping Murphy’s Law out of the equation?

The first key to having a successful contract is to have a contract. It sounds obvious, but contractors are sometimes induced to start work, or perform change orders / additions to contracts, without an executed document in hand.  Maybe the project owner is in a rush, “We need for you to start right away so we can be completed on time.  We’ll do the paperwork later.”

The contractor wants to maintain good will.  They proceed in the hope that their responsiveness will pay off – and sometimes it does.  There are also times when the contractor incurs costs that are never reimbursed because the contract is not executed.  There could be engineering problems, governmental interference or lack of funding. There are any number of reasons for things to go wrong (as our hero indicated.) And for the contractor, they are all bad.

murphyslaw

On the other hand, let’s say there is no problem with the contract.  The paperwork is signed, the work proceeds, is paid for, and the contract is completed with a profit in hand. Is that the end?

No, not quite. Just like there is paperwork to get into the project, there is more to get out of it.  The contractor should obtain written acceptance of the work by the job owner (obligee.) 

  • This important document establishes a completion date for the contract and concludes a portion of the liability that is attached to all open contracts.
  • It will close the Performance and Payment bond if there was one. Closing the file restores the contractors bonding capacity. 
  • It may also be beneficial with lenders.
  • If nothing else, a written acceptance may be a defense when the project owner attempts to call back the contractor at a later date or claim the work was not satisfactory.

Edward_MurphyThese simple procedures are basic, good business practices. Contractors who win work competitively, and are paid under a lump sum contract, already face significant risks.  It is important to have the correct paperwork in hand when starting, modifying, and ending construction projects. 

Major Murphy learned this important lesson the hard way – but you don’t have to! 

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #122: Don’t Sign That Lien Release!

WAIVER OF LIEN BY CONTRACTOR, SUBCONTRACTOR(S) AND SUPPLIER

We, the undersigned, acknowledge receipt of the amounts stated below as full payment for all labor, professional services, materials, or equipment furnished for use on or about the property of…”

In construction, lien releases are common. Project owners expect their general contractor to execute them. GCs demand them from their subcontractors and suppliers. They are part of the routine. If you want to get paid, you sign it. But when should you not sign it? Let’s look at what a lien release does, and when you should be cautious about executing.

The Purpose of Lien Releases
Typically, a lien release is required in connection with a monetary payment. It comes up in any of these situations:

  • Monthly payment made from project owner to the general contractor
  • Monthly payment from GC to a sub or suppliers
  • Final contract payments to any of these

The lien release enables the accounting to transition from one billing cycle to the next. It is a form of receipt that protects the Payor by acknowleging that the Payee has received funds – they relinquish the right to claim they were not paid.

danger-aheadNormally, when contractors and suppliers are unpaid, they can file a lien (a security interest) against the title of the physical property. With such a lien in place, the property cannot be sold.  The lien release / waiver gives up the right to file such a lien and possibly other legal remedies as well.

Lien releases come in two basic flavors, and it is very important to recognize the difference between them.

The Good One: Conditional

“THIS DOCUMENT WAIVES THE CLAIMANT’S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT.”

A release / waiver is Conditional if it waives rights once a condition (usually the receipt of payment) occurs. An example of conditional language is:

“Upon the receipt of $____, Subcontractor hereby waives and releases its lien and bond rights for labor and materials through _________ (date).”

Unless the waiver states otherwise, the conditional waiver is not effective until the condition, such as payment, occurs.

Also note, this wording includes a condition regarding time which protects the claimant’s lien rights arising in the next billing period.

The Bad One: Unconditionalcaution-proceed-carefully-md

“THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.”

Actually it is only bad if the claimant has not yet been paid. Then it would be inadvisable to provide an unconditional release. The claimant will have no recourse if they do not receive their payment, and they will also relinquish their ability to claim against the Payment Bond.

Conclusion
The Conditional Lien Release includes conditions and wording that protects the claimant’s interests.

The Unconditional Release can be detrimental if executed unintentionally or under inappropriate circumstances.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #121: Are Court Bonds Like Fruit?

produce_manMostly we issue site, subdivision and contract surety bonds (Performance & Payment).  However, we are also an important provider of Court and Probate bonds.  We issued a number of interesting court bonds recently so here is some info on this subject.

What Are Court Bonds Are Why Are They Needed?

Generally, court bonds serve three purposes.

  1. They provide required protection for the other party in the litigation (opposite the bond applicant)
  2. They guarantee the payment of related court costs
  3. The court likes them

An Injunction Bond is a good example.  In these legal actions one party wants to limit or prevent the actions of another.  An insurance agency may request an injunction to prevent a former salesman from soliciting their clients.  The court requires the plaintiff (insurance agency) to provide a bond for the protection of the defendant (salesman) in the event it is found that (s)he has been wrongfully restrained.

A Replevin Bond is similar.  These are required when the plaintiff (a bank) wants to seize an asset (your private jet) for failure to pay your finance charges.  The bond will protect you if it is later found they wrongfully seized “Wings Over Yonkers.”  See how these work?  In different situations the bonds provide the same type of function.  The name of the bond identifies the underlying legal action.

Why Do Courts Like Them?

You may think “what’s not to like?!” That’s true. But the court may require a surety bond for a practical reason.  If the litigation involves a financial matter, they could require that an escrow deposit be placed with the court for the benefit of the other party. They would hold this money until the case is decided.

This works, but is not convenient.  Where will the funds be held?  Who is responsible for their safekeeping?  Will there be periodic accounting if the case runs for years?  Who pays the expenses associated with this?  What if the money is misplaced or stolen? 

Compare this to a surety bond: Get the bond, throw it in the folder. Done!

cherriesEven though the court may have the option to take cash in lieu of bond, they may demand the issuance of a surety bond simply for its convenience.

Other Court Bonds

When a money judgment is rendered, the defendant may want the matter heard by the Appellant Court. Let’s say Maynard sued Dobie for money and wins a $10,000 judgment.  Maynard figures “Ok here comes 10 big ones!”  However, Dobie wants to dispute the decision so now Maynard has to wait.

In order to bring the Appeal, Dobie must obtain an Appeal Bond which protects the interests of the court and guarantees prompt payment if Dobie loses again.  To get this bond, he’ll have to give his personal financial statement, his indemnity, and put up maybe $11,000 for the surety to hold.  Oh, and pay the bond premium!  Why is all this necessary?

Bond underwriters know that most defendants lose at the Appellate level.  They also know that the court will simply claim on the bond to pay off the judgement.  This means that underwriters expect full penalty claims on defendant’s appeal bonds – which is why they normally require full collateral for the judgment amount plus interest and expenses.nanners

Conclusion

Hopefully it is apparent that there is a thread of similarity between these different types of court bonds.  This can make it easier to understand them when tey are needed.

Oh, so why are court bonds like fruit?  Because they have appeal!

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #119: Lien On Me

“It ain’t what you don’t know that gets you into trouble.  It’s what you know for sure that just ain’t so.”  A famous quote by…?

Let’s go over what you need to know about construction liens.  They can have a big impact on construction contracts and companies.            Click for mood music!

A Mechanic’s Lien is filed when a subcontractor or supplier on a construction project fails to be paid. The lien is a form of claim filed against the project itself. For example, the unpaid mason (subcontractor) files a claim against the building owner. “My bricks and labor are in that façade. I can’t take them back now, but assert that the general contractor has failed to pay me!”

Liens are used on non-governmental projects. Typically, claimants are prohibited from liening a public building – which is where Payment Bonds come in. Issued by surety companies, the payment bond is a resource to protect suppliers of labor and material from non-payment.

So far that’s all pretty straight forward. On private contracts unpaid subs and suppliers can file a lien. On government jobs they make a claim on the payment bond instead.

Here are some implications worth knowing.

Release of Lien

The lien can be released, or “bonded off,” by the filing of a (you guessed it) Release of Lien Bond. This removes the lien from the property in question, which is beneficial for the project owner, while still providing financial protection for the plaintiff (unpaid sub or supplier.) The dispute is still unresolved, but the plaintiffs security shifts from the physical project to the surety bond.

A release of lien bond is not easy to obtain. But if a payment bond was issued, that surety has motivation to prevent a payment bond claim, and issuing the lien release bond could do so.

When the lien release bond is filed, it takes some pressure off the defendant (general contractor). You can assume the unpaid mason hopes the lien will cause the owner (who is the recipient of the lien) to force the GC to respond. When the lien is bonded off, that effect disappears from the project owner – but not the surety.

Stop Notices

California, Mississippi, Arizona, Alaska and Washington use a slightly different procedure. On governmental projects a Stop Notice is filed which freezes a portion of the project funds to protect the claimant. This forces action on the part of the GC, or they can file a Release of Stop Notice bond to keep the project funds flowing while dealing with the dispute.

Understand the Difference

Mechanic’s Liens are filed against the project owner.  The claim attaches to the real property and is recorded against the property title – which therefore restricts the owner’s ability to dispose of the property.  

With a lien, the claimant may be paid regardless of whether the owner paid the GC.  In fact, the owner may have to pay twice: First to the GC then again to the sub / vendor claimant, to remove the lien and clear the property title.

Stop Notices “trap” contract funds, assuming there are funds to trap.

If the claimant files a Stop Notice after the funds have been disbursed, it is useless. 

Other basic differences:

  • Unlike a lien, the stop notice does not give the debt any security.
  • The stop notice is sent to the relevant parties, but it is not legally recorded such as a lien filed against the property title.  The claim is inherently less official and is sometimes even ignored because of it’s less formal appearance.
  • Unlike a Mechanics Lien, the Stop Notice can affect the entire project because it freezes a portion of the contract funds – which the GC may need in order to continue working.

NOTICE: The author is not an attorney and is not giving legal advice.  This article is for entertainment only.  Gimme a break!

mark-twain

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision and Contract Surety Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #111: WIP Quiz

 When it comes to Bid and Performance Bonds, nothing may be required more often than financial statements and WIP schedules (Work In Process aka Work On Hand).  For mood music, click here.australian-whip

The WIP schedule could be required monthly for active bidders.  Certainly, the construction company management team monitors this critical info.  It tells the tale of how things are going, and where they’re headed. Profitability is revealed.  It is a preview of the upcoming Profit and Loss section in the next financial statement.  Poor results on the WIP schedule equal low Gross Profits on the next P&L – and maybe a net loss.

Let’s look at a couple of examples and see if you can spot what’s going on.  For the sake of illustration, we’ll use an abbreviated format.

On each of the following WIP schedules, compare the expected profit upon completion to the original profit estimate.

Joe Shmoe Construction

Project

Current/Revised Contract Amount

Original Gross Profit Percentage

Billed to Date

Costs to Date (Including change orders)

Revised Remaining Costs to Complete

1001

$1,000,000

10%

$700,000

$602,000

$202,000

Is the current profit projection more or less than originally expected?

  1. More
  2. Less
  3. Exactly right

 

Global Construction and Gutter Cleaning

Project

Current/Revised Contract Amount

Original Gross Profit Percentage

Billed to Date

Costs to Date (Including change orders)

Revised Remaining Costs to Complete

4321

$1,000,000

10%

$700,000

$602,000

$410,000

Is the current profit projection more or less than originally expected?

  1. More
  2. Less
  3. Exactly right

 

Dummenhappie Contracting

Project

Current/Revised Contract Amount

Original Gross Profit Percentage

Billed to Date

Costs to Date (Including change orders)

Revised Remaining Costs to Complete

007

$1,000,000

10%

$700,000

$630,000

$270,000

Is the current profit projection more or less than originally expected?

  1. More
  2. Less
  3. Exactly right

 

Got your answers?  Let’s go over these:

Joe Shmoe originally projected $100,000 profit (10% of $1,000,000).  Now it has nearly doubled! (602,000+202,000=804,000.   1,000,000-804,000=196,000)  “a. More”

Global starts with the same numbers (to help illustrate our point), but the costs are different.

(602,000+410,000=1,012,000   1,000,000-1,012,000= -12,000)  Not only has the profit margin slipped, it exceeds the contract amount resulting in a projected overall loss. “b. Less”

And finally Dummenhappie.  This one is amazing!  They are about ¾ of the way through the project (actually 70%), and right on target profit wise. The expected profits and total costs are exactly as predicted before they started the work.

(630,000+270,000=900,000   1,000,000-900,000=100,000)  “c. Exactly right”

Think about that. This answer “Exactly right” means prior to actually starting the project, they accurately predicted the exact number of labor hours.  Do you think the reality of the project might be somewhat different from the prediction?  Maybe they will hit unexpected obstacles and things will go slower (higher labor costs).  Or they may find more efficient ways to perform the work as it progresses (lower labor costs).  The cost of material purchases can also vary.  Get the point? It’s hard it imagine any project in which the costs can be perfectly predicted in advance.

indy-whipSo what’s going on here if Dummenhappie isn’t brilliantenluckie?  Our assumption is that the contractor has failed to RE-estimate the remaining costs to complete.  They are still relying on the original estimate – not analyzing the actual “costs to complete” during the life of the project.

Relying solely on the original cost estimate is a dangerous and weak practice.  The contractor may be unpleasantly surprised if unanticipated costs (such as labor inefficiency) have eroded the profit margin.  The worst part: They won’t know about it until the end, when it’s too late to make a correction!

Surety underwriters will detect if the remaining costs are not being reevaluated.  It reflects poorly on the contractor’s management practices.  It also means their profit projections may be totally unreliable.

The solution is to keep accurate records of the labor and material costs that go into each job, and periodically reevaluate (re-estimate) the remaining costs to complete. 

You can have a lot of fun with WIPS!  We’ve just touched on one part in this article. The analyst must not only review the profit trend, but also the method of calculation to confirm that accounting procedures are appropriate.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision, Bid and Performance Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #110: Contract Additions – Is More Always Better?

USUALLY more is better. 

  • “Would you like more ice cream?”
  • “Congratulations on your raise!”
  • “Honey, we’re pregnant!”more2

The same is true when it comes to construction contracts.  It is not uncommon for the scope of work to be modified. The project engineer may have discovered a problem and they will pay the contractor to fix it.

There could be a desire to expand or enhance the project, resulting in an increased contract price.  These additions occur routinely. Sometimes there are also “deducts” meaning an amendment that reduces the contract amount.

Additions to the contract mean more revenues for the contractor – it’s a good thing, unless unexpected problems pop up.

In this discussion, we are talking specifically about bonded contracts.  Whether public or private, prime or subcontract, our comments herein apply.

more3Bond Amount vs. Contract Amount

Surety bonds, Performance and Payment Bonds on contracts, are all similar but may have important variations.  It is common for the bond to adjust upward to follow an addition in the contract amount.  This means if the $1,000,000 contract is increased by amendment to $1,200,000, the bond is increased so that 100% coverage is maintained.

Not only does the bond increase, the adjustment is usually automatic.  Most bonds say there is an automatic increase with no obligation to inform the surety of the change.

When the surety is required to accept the additional exposure, they are entitled to be paid for it.

The Downside of Contract Additions

What could possibly go wrong to spoil this perfect picture? You have a contract and Poof!” it just got bigger!  You provided a surety bond and “Wham!” it automatically adjusted to the new amount!  All good!

  1. One problem that can occur involves the additional bond premium. The subject is sometimes complicated, but the short version is that the surety will charge for the increase.  If the contractor fails to include the additional bond fee in the negotiation for the amendment, the bond fee will come out of their profits instead of being passed on to the project owner as is normal.
  2. A second issue can arise in connection with the automatic bond increase. Sometimes it doesn’t happen.  Some bond forms state that contract increases in excess of a stated percentage (e.g. 20%) must be pre-approved by the surety.  This is to prevent the surety from being pulled into a contract amount far above the original support level. If the surety refuses to accept the increase, the contractor will have the difficult / unpleasant task of seeking a new surety and possibly paying twice to bond the project!  Doesn’t get much uglier than that…

Subtletiesmore1

On the subject of the bond fee, some sureties demand payment when the contract increase occurs.  The thinking is, “We have the exposure now, why not get paid?”

Other companies may wait until the contract ends and net out additions and deducts, then charge for the net increase over the original bond amount.

You may also run into companies that charge for increases, but do not net out or give refunds for contract deductions.

If you want to know what to expect in these situations, you must ask for written answers from the surety.  These fine points are usually not stated in writing in advance – but are worth knowing.  With contract additions, it’s what you don’t know that can hurt you.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision, Bid and Performance Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #108: Work On Hand – So Mysterious and Beguiling

mysterious-eyesThe confusion is amazing.  Why is this subject so mysterious and perplexing for many professionals?

Let’s start with something really simple: What is “Work On Hand” for a construction company? 

This is a crucial question because when you get bid and performance bonds, there is always an aggregate capacity limit, which is calculated using the Work On Hand (WOH).  So you MUST know how to figure it.

Do you see the correct definition?

  1. The incomplete portion of all bonded projects
  2. The incomplete portion of all projects
  3. The unbilled portion of all bonded projects
  4. The unbilled portion of all projects
  5. All contract costs
  6. Contract price minus costs
  7. Original contract price minus costs incurred to date
  8. Contract price minus approved (by architect or owner) billings
  9. Contract price (including change orders) minus current estimate of total costs
  10. The sum of open (undecided) bids plus the unbilled portion of all projects

You like them ALL?!  They sound pretty good, but unfortunately… none are correct.  The bonding definition (that’s used throughout the industry) is based on the accountant’s approach.  It’s mysterious. And only one answer makes sense and is correct.

Dive In

If you have followed our articles, you know that billings are not part of the answer, even though many contractors like to use this approach.  They may choose #4 “The unbilled portion of all projects” because of their need to monitor cash flow.

To rely on this approach, you must depend on the project owner to PAY CORRECTLY based on the degree of completion.  In other words, when you are 50% complete, you should be paid 50% of the contract amount. To continue this fallacy, therefore, when you make your last billing to reach 100% of the contract price, you must be complete with the actual work.

The problem is that the project owner does not know the cost of the remaining work, which defines the degree of completion.

Challenging question: How reliable would it be to use billings to determine the WOH if the project was unprofitable? (costs exceed the contract amount)

The Truth Revealed

Accountants tell us that the degree of completion and the remaining WOH are defined by costs.  The reason? It is because regardless of the state of the billings, the project is not complete until there are no more costs left to incur.  When the job doesn’t need one more brick or hour of labor, it is 100% complete.

The Secret Formula

WOH consists of the following:

  • Current estimated costs to complete on all projects, plus
  • The full amount of new contracts just started, plus
  • The full amount of undecided bids and contract proposals

Beguiled no more! If a contractor says “The job is going well. We are already 60% billed!” You say “Great, are your cost projections within budget?”