Secrets of Bonding #151: It’s Time For…Timing!

With Surety Bonds, Timing can be critically important.  There are certain things that must happen first.  You can’t get them out of order. Here are some examples.  Do you know which comes first, and why?

Cover the answers with a piece of paper as you scroll down. (Paper is white stuff people used to write on. Really!)

  1. Bid Bond / Performance Bond
    • OK that was an easy one. They get harder. Bid bonds always come first – if there is one.  Not all performance bonds are preceded by a bid bond. Negotiated projects would be an example.
  2. Bond execution / Indemnity Agreement execution
    • The Indemnity always comes before the bond. It is the promise to pay back the surety in the event of a claim / loss. Sureties want this protection in place before they assume any risk.
  3. Surety Consent to Final Payment / Obligee Status Inquiry Form
    • The Status Inquiry form comes first. It is the obligees statement that the work is acceptable.  The surety requires to see this before agreeing to release the final payment.  If there are unresolved issues, the contractor must address them before the last contract funds come over. (That’s true motivation!)
  4. Payment Bond Release (exoneration) / End of Lien Period
    • Since the bond guarantees the payments that may be owed during the lien period, the time for liens must end before the bond is concluded.
  5. Contract Acceptance / Maintenance Bond Issuance
    • Sureties want the contract accepted first and the P&P bond released before assuming the risk associated with a Maintenance bond. Some obligees require issuance of the maintenance bond simultaneously with the P&P bond at the start of the project, but underwriters resist this.
  6. Bid Results / P&P Bond Issuance
    • Underwriters want to evaluate the adequacy of the contract price prior to bond issuance. They do this by evaluating the bid results, comparing the various proposals from different companies.  In some cases, the bid results are not published, in which case they have wing it!
  7. P&P Bond for Started Project / All Right Letter
    • The All Right letter is the obligee’s assurance that there is not already a problem on the contract that will result in an immediate bond claim. Sureties require a clean bill of health before bonding a started project (unless the degree of completion is very low i.e. 5%).
  8. Award Letter / Notice to Proceed
    • Award letter comes first, then the contract signing and Notice to Proceed is issued. Then “Grab ya hamma!”
  9. Tough Bond Problem / Call FIA Surety!  856-304-7348
    • You can call us for discussion or general info any time. However, when a tough bond problem arises, that’s your cue to call in the experts. 

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision, Bid and Performance Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

(Don’t miss our next exciting article.  Click the “Follow” button at the top right.)

Secrets of Bonding #150: Surety Bonds Are Exactly Like Insurance

Surety Bonds are exactly the same as Insurance.  They are like… twins!

If you are a follower of the Secrets blog, this statement may surprise you.

Go all the way back, way back to article #1 in this series published in February 2014.  It was titled “Bonds Are Not Insurance.” OK, if you read it, so when did they start being like insurance?

Question: Does this sound familiar?

Your contractor client calls up and tells you they have just won a new contract and are ready to sign. “We need to provide an Insurance Certificate.”

What would be your very next comment? Would you say “I’ll transfer the call to Bertha who issues our certificates!” Or would you ask for a copy of the insurance specification and the new contract so you can review them?

You’d probably do the latter. You need this to determine if there are any special requirements, onerous clauses and to determine the coverage levels needed.  Before issuing the certificate, you may need to modify their program to be compliant.

Let’s compare this to Surety Bonds. When an agent colleague sends over a bond request form (or bond app), we always ask for the written bonding requirements, any mandatory bond forms and a copy of the contract if it is available.

We do this for exactly the same reason as with insurance. We want to understand what the customer needs, and be sure what we provide fulfills the requirements. It’s just good business.

Admittedly, bonds are still very different from insurance – except for this common underwriting step. You agree?

Now let’s go a step deeper.  If we will always review these supporting documents to accompany each bond request, what are we looking for when we get them?  What are the hot buttons?

Bond Forms

It is important to note if bond forms are included in the specification.  If they are, you must determine if they are mandatory to use, or if equivalent or standard forms may also be accepted.

In contract surety, all bid bonds are pretty much the same.  However, Performance and Payment bonds can vary great depending on the obligee (protected party).

For example, on all federal projects, the bond forms are the same, and using them is mandatory.

The American Institute of Architects (AIA) has developed a standard set of bond forms that are well accepted by all parties and commonly used in construction.  You may find these are stipulated.

When it comes to private contracts, such as a subcontractor working for a general contractor, the bond forms can be anything.  It might say AIA forms, or they might invent their own P&P bond form that is mandatory. You need to know!

Surety Credentials

The standard for the bonding company could be as simple as “the surety must be acceptable to the obligee.”

However, there can also be licensing and rating requirements that must be adhered to.  A license issued by the local state insurance department could be required “a bonding company authorized to do business in New Jersey.”

A minimum size and strength rating from a rating bureau like A.M. Best could be indicated.

Along similar lines, a surety listed on Circular 570 (a federal approval list) is not uncommon.

Conclusion

There is no way to assure your client has exactly what they need other than to review the requirements. Failure to provide exactly what a client needs can lead to embarrassment, loss of a contract and one disappointed “former” customer. 

Bonds are NOT the twin of insurance, but the underwriting has some common elements, namely the need for certainly when providing the correct coverage issued by an appropriate carrier.  Get the supporting documents and read them. Discussion with the client and underwriter may be appropriate. 

In both bonds and insurance, this procedure protects your E&O, assures your professional performance and leads to stronger client relations.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision, Bid and Performance Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

Secrets of Bonding #149: Be A Surety Bond Fixer

Being a problem solver is a great way to deliver value for your customers.  When it comes to surety bond problems, do you have any creative solutions?  Are there tricks up your sleeve that make your clients say “Mr. / Ms. Bond Fixer, I’m sure glad I called you today!

Well try your hand at solving these surety bond problems.  They may have more than one good solution, but I will give at least one for each at the end.

  1. The company owner is willing to give personal indemnity, but the spouse refuses. Your solution?
  2. The underwriter has approved a performance bond but collateral is required (money the contractor lets the surety hold as a security deposit against possible bond claims.) The contractor doesn’t have the cash to put up. Your solution?
  3. The subcontractor is required to provide a P&P bond, but no surety will support it. Your solution?
  4. In order to support a Performance Bond, the underwriter requires a CPA Reviewed financial statement. The client didn’t anticipate this and only produced a Compilation (lower quality) report at their last year-end. Your solution?
  5. A property owner has awarded a project to the contractor, but he is being required to issue a performance bond to the local township. The underwriter declines this stating “there is no contract for the performance bond to cover.” Your solution?
  6. Company Working Capital is too low. Main problem is that Accounts Receivable were overdue at fiscal year-end. Your solution?
  7. An old line excavation contractor can’t get bonded because their Net Worth is too low and the Debt to Equity ratio is too high! Your solution?

 

Feel free to post your ideas on how to fix these bond problems.

 

Possible Solutions:

  1. Indemnity – Get the spouse to sign a “non-transfer agreement” prohibiting the indemnitors assets from being moved over. Other possibilities: Spouse indemnity that excludes certain assets, capped indemnity with a maximum dollar value or trigger indemnity that is active only under special circumstances.
  2. Collateral – Can another party put up the money? Could be in the form of a loan to the company owner. Maybe an interested subcontractor or supplier will put it up so the contract can proceed (and they get the work.) How about using Funds Control with a hold back that collects the collateral account from the contract funds as the work progresses?
  3. No subcontract bond – The general contractor could add a retainage clause to the contract, or increase it in lieu of the bond (hold back some money until completion as a security deposit.) On a short term subcontract, make a single payment for the full contract amount at the end when the work is satisfactorily completed.
  4. Compilation FS – Have the CPA go back and do the additional work to upgrade the report. Sometimes, if it is late in the fiscal year, the underwriter may proceed with bond issuance based on proof that the next CPA statement will be a Review. Get a copy of the engagement letter with the CPA.
  5. No contract – The underwriter is correct. There is no contract with the township, it is with the property owner.  A bond on the property owners contract would be for the wrong amount in any event.  A Site or Subdivision bond is the correct way to protect the interests of the municipality.  It would guarantee the construction of the “public improvements” such as roads, sidewalks, sewers, etc. Caution: The property owner should be the applicant for this bond (not the contractor!) or they should at least be an indemnitor.
  6. Slow Receivables – Slow receivables are disallowed by analysts based on the expectation that they will never be collected. Obtain a current update on the collections of the A/R list from the financial statement date. If they have subsequently been collected, they are included in the Working Capital analysis despite being old on the FS date.
  7. Low NW – After years of operation, depreciation can wipe out the asset value of heavy equipment on the Balance Sheet. Document the current value to re-capture these dollars for the financial analysis. Get a copy of the equipment floater and a current appraisal to determine the current “forced sale” value.
  8. Other problems – Think we listed all the possible bonding problems in this article? No, we left out a few million! When you get tough bond problems, give us a call. Surety is  all we do!  We have the expertise.

FIA Surety is a NJ based bonding company (carrier) that has specialized in Site, Subdivision, Bid and Performance Bonds since 1979 – we’re good at it!  Call us with your next one.

Steve Golia, Marketing Mgr.: 856-304-7348

First Indemnity of America Ins. Co.

(Don’t miss our next exciting article.  Click the “Follow” button at the top right.)